Part Image

EVM10-50-2P - Eaton

Description: EATON BUSSMANN - EVM10-50-2P - Fuse, Automotive, Fast Acting, 50 A, 500 V, 10mm x 38mm, EVM10 Series

Download EVM10-50-2P Model
Schematic
symbols
Schematic symbol is unavailable for download
PCB
footprints
PCB footprint is unavailable for download
3D
models
3D model is unavailable for download
PCB Footprints
EVM10-50-2P - Eaton PCB footprint - Other - Other - EVM10-50-2P-1
click to zoom
3D Models
EVM10-50-2P - Eaton  - 3D model - Other - EVM10-50-2P-1
click to zoom

EVM10-50-2P Details

  • Manufacturer Part Number:

    EVM10-50-2P

  • Manufacturer:

    Eaton Electronics

Trust Checks

This model has been built in collaboration with the manufacturer.
Manufacturer Collaborated
This model has been verified by system checks.
System Verified
This model has been reviewed by community users.
Community Approved
Sponsored

EVM10-50-2P Overview

Use the download button to access the EVM10-50-2P schematic symbol, PCB footprint, and 3D model.
To find more CAD model downloads similar to this part, try a partial part number search, like EVM10, or try a keyword search, such as Trimmer Potentiometers

Parts related to EVM10-50-2P

Showing 0 results