Part Image

GS-EVM-DRG-100V7R-GS2 - GaN Systems

Description: GS-EVM-DRG-100V7R-GS2 100 V Driver GaN 7mΩ DC/DC Power Stage Evaluation Module

Download GS-EVM-DRG-100V7R-GS2 Model
Schematic
symbols
Schematic symbol is unavailable for download
PCB
footprints
PCB footprint is unavailable for download
3D
models
3D model is unavailable for download
PCB Footprints
GS-EVM-DRG-100V7R-GS2 - GaN Systems PCB footprint - Other - Other - GS-EVM-DRG-100V7R-GS2
click to zoom
3D Models
GS-EVM-DRG-100V7R-GS2 - GaN Systems  - 3D model - Other - GS-EVM-DRG-100V7R-GS2
click to zoom

GS-EVM-DRG-100V7R-GS2 Details

  • Manufacturer Part Number:

    GS-EVM-DRG-100V7R-GS2

  • Manufacturer:

    GaN Systems

Trust Checks

This model has been provided by an expert contributor.
Expert Contribution
This model has been verified by system checks.
System Verified
This model has been reviewed by community users.
Community Approved
Sponsored

GS-EVM-DRG-100V7R-GS2 Overview

Use the download button to access the GS-EVM-DRG-100V7R-GS2 schematic symbol, PCB footprint, and 3D model.
To find more CAD model downloads similar to this part, try a partial part number search, like GS-EV, or try a keyword search, such as Transient Suppressors

Parts related to GS-EVM-DRG-100V7R-GS2

Showing 0 results