Part Image

MCIMX502EVM8B - NXP

Description: i.MX50 Applications Processors

Download MCIMX502EVM8B Model
Schematic
symbols
Schematic symbol is unavailable for download
PCB
footprints
PCB footprint is unavailable for download
3D
models
3D model is unavailable for download
PCB Footprints
MCIMX502EVM8B - NXP PCB footprint - BGA - BGA - 1568-01, 17 × 17 mm, 0.8 Pitch
click to zoom
3D Models
MCIMX502EVM8B - NXP  - 3D model - BGA - 1568-01, 17 × 17 mm, 0.8 Pitch
click to zoom

MCIMX502EVM8B Details

  • Manufacturer Part Number:

    MCIMX502EVM8B

  • Rohs Code:

    Yes

  • Part Life Cycle Code:

    Obsolete

  • Package Description:

    MABGA-400

  • Country Of Origin:

    Mainland China

  • ECCN Code:

    5A992.C

  • HTS Code:

    8542.31.00.01

  • Manufacturer:

    NXP Semiconductors

  • YTEOL:

    0

  • JESD-30 Code:

    S-PBGA-B400

  • JESD-609 Code:

    e1

  • Length:

    17 mm

  • Moisture Sensitivity Level:

    3

  • Number of Terminals:

    400

  • Operating Temperature-Max:

    70 °C

  • Operating Temperature-Min:

    -20 °C

  • Package Body Material:

    PLASTIC/EPOXY

  • Package Code:

    LFBGA

  • Package Equivalence Code:

    BGA400,20X20,32

  • Package Shape:

    SQUARE

  • Package Style:

    GRID ARRAY, LOW PROFILE, FINE PITCH

  • Packing Method:

    TRAY

  • Peak Reflow Temperature (Cel):

    260

  • Qualification Status:

    Not Qualified

  • Seated Height-Max:

    1.6 mm

  • Supply Voltage-Max:

    1.15 V

  • Supply Voltage-Min:

    0.95 V

  • Supply Voltage-Nom:

    1.05 V

  • Surface Mount:

    YES

  • Technology:

    CMOS

  • Temperature Grade:

    OTHER

  • Terminal Finish:

    Nickel/Gold (Ni/Au)

  • Terminal Form:

    BALL

  • Terminal Pitch:

    0.8 mm

  • Terminal Position:

    BOTTOM

  • Time@Peak Reflow Temperature-Max (s):

    40

  • Width:

    17 mm

  • uPs/uCs/Peripheral ICs Type:

    SoC

Trust Checks

This model has been provided by community users.
Community Provided
This model has been verified by system checks.
System Verified
This model has been reviewed by community users.
Community Approved
Sponsored

MCIMX502EVM8B Overview

Use the download button to access the MCIMX502EVM8B schematic symbol, PCB footprint, and 3D model.
To find more CAD model downloads similar to this part, try a partial part number search, like MCIMX, or try a keyword search, such as Other uPs/uCs/Peripheral ICs

About NXP

NXP Semiconductors is a leading manufacturer of semiconductor devices with a wide range of semiconductor solutions, including microcontrollers, sensors, connectivity solutions, power management ICs, and security solutions. These products are used in a variety of applications such as automotive, industrial automation, smart homes, mobile devices, and more. NXP Semiconductors is one of the world’s largest semiconductor companies and is headquartered in Eindhoven, the Netherlands.

Parts related to MCIMX502EVM8B

Showing 0 results