Part Image

MCIMX6S5EVM10ACR - NXP

Description: SOC i.MX 6Solo ARM Cortex A9 0.04um Automotive 624-Pin MAP-BGA T/R

Download MCIMX6S5EVM10ACR Model
Schematic
symbols
Schematic symbol is unavailable for download
PCB
footprints
PCB footprint is unavailable for download
3D
models
3D model is unavailable for download
PCB Footprints
MCIMX6S5EVM10ACR - NXP PCB footprint - BGA - BGA - SOT1529- 1
click to zoom
3D Models
MCIMX6S5EVM10ACR - NXP  - 3D model - BGA - SOT1529- 1
click to zoom

MCIMX6S5EVM10ACR Details

  • Manufacturer Part Number:

    MCIMX6S5EVM10ACR

  • Rohs Code:

    Yes

  • Part Life Cycle Code:

    Not Recommended

  • HTS Code:

    8542.31.00.30

  • Manufacturer:

    NXP Semiconductors

  • YTEOL:

    3

  • Moisture Sensitivity Level:

    3

  • Peak Reflow Temperature (Cel):

    260

  • Time@Peak Reflow Temperature-Max (s):

    40

  • uPs/uCs/Peripheral ICs Type:

    SoC

Trust Checks

This model has been provided by community users.
Community Provided
This model has been verified by system checks.
System Verified
This model has been reviewed by community users.
Community Approved
Sponsored

MCIMX6S5EVM10ACR Overview

Use the download button to access the MCIMX6S5EVM10ACR schematic symbol, PCB footprint, and 3D model.
To find more CAD model downloads similar to this part, try a partial part number search, like MCIMX, or try a keyword search, such as Other uPs/uCs/Peripheral ICs

About NXP

NXP Semiconductors is a leading manufacturer of semiconductor devices with a wide range of semiconductor solutions, including microcontrollers, sensors, connectivity solutions, power management ICs, and security solutions. These products are used in a variety of applications such as automotive, industrial automation, smart homes, mobile devices, and more. NXP Semiconductors is one of the world’s largest semiconductor companies and is headquartered in Eindhoven, the Netherlands.

Parts related to MCIMX6S5EVM10ACR

Showing 0 results