Part Image

MCIMX7D5EVM10SD - NXP

Description: i.MX 7Dual SOC featuring an ARM Cortex A7 for connecting peripherals

Download MCIMX7D5EVM10SD Model
Schematic
symbols
Schematic symbol is unavailable for download
PCB
footprints
PCB footprint is unavailable for download
3D
models
3D model is unavailable for download
PCB Footprints
MCIMX7D5EVM10SD - NXP PCB footprint - BGA - BGA - SOT1525-1
click to zoom
3D Models
MCIMX7D5EVM10SD - NXP  - 3D model - BGA - SOT1525-1
click to zoom

MCIMX7D5EVM10SD Details

  • Manufacturer Part Number:

    MCIMX7D5EVM10SD

  • Rohs Code:

    Yes

  • Part Life Cycle Code:

    Active

  • Package Description:

    FBGA-541

  • ECCN Code:

    5A992.C

  • HTS Code:

    8542.31.00.01

  • Factory Lead Time:

    23 Weeks

  • Manufacturer:

    NXP Semiconductors

  • YTEOL:

    9

  • JESD-30 Code:

    S-PBGA-B541

  • Length:

    19 mm

  • Moisture Sensitivity Level:

    3

  • Number of Terminals:

    541

  • Operating Temperature-Max:

    105 °C

  • Operating Temperature-Min:

    -20 °C

  • Package Body Material:

    PLASTIC/EPOXY

  • Package Code:

    LFBGA

  • Package Equivalence Code:

    BGA541,25X25,29

  • Package Shape:

    SQUARE

  • Package Style:

    GRID ARRAY, LOW PROFILE, FINE PITCH

  • Peak Reflow Temperature (Cel):

    260

  • Seated Height-Max:

    1.42 mm

  • Supply Voltage-Max:

    1.25 V

  • Supply Voltage-Min:

    1.2 V

  • Supply Voltage-Nom:

    1.225 V

  • Surface Mount:

    YES

  • Technology:

    CMOS

  • Temperature Grade:

    OTHER

  • Terminal Form:

    BALL

  • Terminal Pitch:

    0.75 mm

  • Terminal Position:

    BOTTOM

  • Time@Peak Reflow Temperature-Max (s):

    40

  • Width:

    19 mm

  • uPs/uCs/Peripheral ICs Type:

    SoC

MCIMX7D5EVM10SD Frequently Asked Questions (FAQs)

  • The recommended power-on sequence is to power up the VDD_HIGH first, followed by VDD_SOC, and then the VDD_LOW. This ensures that the internal voltage regulators are powered up in the correct order.
  • The clock settings can be configured using the Clock Control Unit (CCU) registers. The CCU provides a flexible clock tree that allows for dynamic clock frequency changes. Refer to the MCIMX7D5EVM10SD reference manual for detailed information on clock configuration.
  • The maximum operating temperature range for the MCIMX7D5EVM10SD is -40°C to 105°C. However, it's recommended to operate the device within the recommended temperature range of 0°C to 90°C for optimal performance and reliability.
  • Secure boot can be implemented using the High-Assurance Boot (HAB) feature on the MCIMX7D5EVM10SD. HAB provides a secure boot mechanism that ensures the authenticity and integrity of the boot process. Refer to the MCIMX7D5EVM10SD reference manual for detailed information on implementing secure boot.
  • The MCIMX7D5EVM10SD can support up to 4GB of RAM. However, the actual amount of RAM that can be used depends on the specific use case and system design.

Trust Checks

This model has been provided by community users.
Community Provided
This model has been verified by system checks.
System Verified
This model has been reviewed by community users.
Community Approved
Sponsored

MCIMX7D5EVM10SD Overview

Use the download button to access the MCIMX7D5EVM10SD schematic symbol, PCB footprint, and 3D model.
To find more CAD model downloads similar to this part, try a partial part number search, like MCIMX, or try a keyword search, such as Other uPs/uCs/Peripheral ICs

About NXP

NXP Semiconductors is a leading manufacturer of semiconductor devices with a wide range of semiconductor solutions, including microcontrollers, sensors, connectivity solutions, power management ICs, and security solutions. These products are used in a variety of applications such as automotive, industrial automation, smart homes, mobile devices, and more. NXP Semiconductors is one of the world’s largest semiconductor companies and is headquartered in Eindhoven, the Netherlands.

Parts related to MCIMX7D5EVM10SD

Showing 0 results