Part Image

MCIMX7S5EVM08SC - NXP

Description: Processors - Application Specialized i.MX 7Solo:1x Cortex A7, 1x USB 2.0 OTG with PHY, 2x SDIO/MMC, CAN, Ethernet, Security

Download MCIMX7S5EVM08SC Model
Schematic
symbols
Schematic symbol is unavailable for download
PCB
footprints
PCB footprint is unavailable for download
3D
models
3D model is unavailable for download
PCB Footprints
MCIMX7S5EVM08SC - NXP PCB footprint - BGA - BGA - Case “Y”, 19 x 19 mm, 0.75 mm pitch
click to zoom
3D Models
MCIMX7S5EVM08SC - NXP  - 3D model - BGA - Case “Y”, 19 x 19 mm, 0.75 mm pitch
click to zoom

MCIMX7S5EVM08SC Details

  • Manufacturer Part Number:

    MCIMX7S5EVM08SC

  • Rohs Code:

    Yes

  • Part Life Cycle Code:

    Obsolete

  • Package Description:

    FBGA-541

  • ECCN Code:

    5A992.C

  • HTS Code:

    8542.31.00.01

  • Date Of Intro:

    2016-05-12

  • Manufacturer:

    NXP Semiconductors

  • YTEOL:

    0

  • Additional Feature:

    SEATED-HGT CALCULATED

  • JESD-30 Code:

    S-PBGA-B541

  • Length:

    19 mm

  • Moisture Sensitivity Level:

    3

  • Number of Terminals:

    541

  • Operating Temperature-Max:

    105 °C

  • Operating Temperature-Min:

    -20 °C

  • Package Body Material:

    PLASTIC/EPOXY

  • Package Code:

    LFBGA

  • Package Shape:

    SQUARE

  • Package Style:

    GRID ARRAY, LOW PROFILE, FINE PITCH

  • Packing Method:

    TRAY

  • Peak Reflow Temperature (Cel):

    260

  • Seated Height-Max:

    1.42 mm

  • Supply Voltage-Max:

    1.155 V

  • Supply Voltage-Min:

    0.95 V

  • Supply Voltage-Nom:

    1 V

  • Surface Mount:

    YES

  • Technology:

    CMOS

  • Temperature Grade:

    OTHER

  • Terminal Form:

    BALL

  • Terminal Pitch:

    0.75 mm

  • Terminal Position:

    BOTTOM

  • Time@Peak Reflow Temperature-Max (s):

    40

  • Width:

    19 mm

  • uPs/uCs/Peripheral ICs Type:

    SoC

MCIMX7S5EVM08SC Frequently Asked Questions (FAQs)

  • The recommended power-on sequence is to apply power to the VDD_HIGH first, followed by VDD_SOC, and then VDD_LOW. This ensures that the internal voltage regulators are powered up in the correct order.
  • The clock sources can be configured using the Clock Controller (CCM) module. The CCM module allows you to select the clock source, configure the clock frequency, and enable/disable clock outputs. Refer to the MCIMX7S5EVM08SC reference manual for more information.
  • The maximum operating temperature range for the MCIMX7S5EVM08SC is -40°C to 105°C. However, it's recommended to operate the device within the recommended temperature range of 0°C to 90°C for optimal performance and reliability.
  • Secure boot on the MCIMX7S5EVM08SC can be implemented using the Boot ROM and the High-Assurance Boot (HAB) mechanism. The Boot ROM verifies the authenticity of the boot loader and the operating system, while the HAB mechanism ensures that the boot process is secure and tamper-evident.
  • The MCIMX7S5EVM08SC has 1 GB of DDR3L RAM and 4 GB of eMMC flash memory. However, the actual available memory may vary depending on the specific configuration and usage.

Trust Checks

This model has been provided by an expert contributor.
Expert Contribution
This model has been verified by system checks.
System Verified
This model has been reviewed by community users.
Community Approved
Sponsored

MCIMX7S5EVM08SC Overview

Use the download button to access the MCIMX7S5EVM08SC schematic symbol, PCB footprint, and 3D model.
To find more CAD model downloads similar to this part, try a partial part number search, like MCIMX, or try a keyword search, such as Other uPs/uCs/Peripheral ICs

About NXP

NXP Semiconductors is a leading manufacturer of semiconductor devices with a wide range of semiconductor solutions, including microcontrollers, sensors, connectivity solutions, power management ICs, and security solutions. These products are used in a variety of applications such as automotive, industrial automation, smart homes, mobile devices, and more. NXP Semiconductors is one of the world’s largest semiconductor companies and is headquartered in Eindhoven, the Netherlands.

Parts related to MCIMX7S5EVM08SC

Showing 0 results