Part Image

PCIMX6X4EVM10AB - NXP

Description: CPU SMT 1GHz i.MX 6SoloX Extended Consumer MAPBGA 19x19 0.8mm VM

Download PCIMX6X4EVM10AB Model
Schematic
symbols
Schematic symbol is unavailable for download
PCB
footprints
PCB footprint is unavailable for download
3D
models
3D model is unavailable for download
PCB Footprints
PCIMX6X4EVM10AB - NXP PCB footprint - BGA - BGA - 19x19 mm BGA Package
click to zoom
3D Models
PCIMX6X4EVM10AB - NXP  - 3D model - BGA - 19x19 mm BGA Package
click to zoom

PCIMX6X4EVM10AB Details

  • Manufacturer Part Number:

    PCIMX6X4EVM10AB

  • Manufacturer:

    NXP Semiconductors

Trust Checks

This model has been provided by community users.
Community Provided
This model has been verified by system checks.
System Verified
This model has been reviewed by community users.
Community Approved
Sponsored

PCIMX6X4EVM10AB Overview

Use the download button to access the PCIMX6X4EVM10AB schematic symbol, PCB footprint, and 3D model.
To find more CAD model downloads similar to this part, try a partial part number search, like PCIMX, or try a keyword search, such as Multifunction Peripherals

About NXP

NXP Semiconductors is a leading manufacturer of semiconductor devices with a wide range of semiconductor solutions, including microcontrollers, sensors, connectivity solutions, power management ICs, and security solutions. These products are used in a variety of applications such as automotive, industrial automation, smart homes, mobile devices, and more. NXP Semiconductors is one of the world’s largest semiconductor companies and is headquartered in Eindhoven, the Netherlands.

Parts related to PCIMX6X4EVM10AB

Showing 0 results