Part Image

BQ24650EVM-639 - Texas Instruments

Description: Maximum Power Point Tracking (MPPT) capability by input Voltage regulation • Programmable MPPT setting • 5-V to 28-V Input solar panel • 600-kHz NMOS-NMOS Synchronous buck controller • Resistor programmable float voltage • Accommodates Li-Ion/Polymer, LiFePO4, lead acid chemistries • Accuracy – ±0.5% Charge voltage regulation – ±3% Charge current regulation – ±0.6% Input voltage regulation • High Integration – Internal loop compensation – Internal digital soft start • Safety – Input overvol

Download BQ24650EVM-639 Model
Schematic
symbols
Schematic symbol is unavailable for download
PCB
footprints
PCB footprint is unavailable for download
3D
models
3D model is unavailable for download
PCB Footprints
BQ24650EVM-639 - Texas Instruments PCB footprint - Quad Flat No-Lead - Quad Flat No-Lead - RVA (S-PVQFN-N16)
click to zoom
3D Models
BQ24650EVM-639 - Texas Instruments  - 3D model - Quad Flat No-Lead - RVA (S-PVQFN-N16)
click to zoom

BQ24650EVM-639 Details

  • Manufacturer Part Number:

    BQ24650EVM-639

  • Manufacturer:

    Texas Instruments

Trust Checks

This model has been provided by community users.
Community Provided
This model has been verified by system checks.
System Verified
This model has been reviewed by community users.
Community Approved
Sponsored

BQ24650EVM-639 Overview

Use the download button to access the BQ24650EVM-639 schematic symbol, PCB footprint, and 3D model.
To find more CAD model downloads similar to this part, try a partial part number search, like BQ246, or try a keyword search, such as Power Management Circuits

About Texas Instruments

Texas Instruments (TI) designs and manufactures semiconductors and integrated circuits for a wide range of applications. The company's product portfolio includes analog chips, which are essential for managing power and signal functions in electronic devices, and embedded processors, which serve as the brains in various systems, enabling functionality in everything from industrial equipment to consumer electronics. TI's innovations in semiconductor technology have made it a leader in the industry.

Parts related to BQ24650EVM-639

Showing 0 results