Part Image

INA2290EVM - Texas Instruments

Description: Texas Instruments INA2290 120-V common-mode, ultra-precise current sense amplifier evaluation module

Download INA2290EVM Model
Schematic
symbols
Schematic symbol is unavailable for download
PCB
footprints
PCB footprint is unavailable for download
3D
models
3D model is unavailable for download
PCB Footprints
INA2290EVM - Texas Instruments PCB footprint - Small Outline Packages - Small Outline Packages - DGK  (S-PDSO-G8)
click to zoom
3D Models
INA2290EVM - Texas Instruments  - 3D model - Small Outline Packages - DGK  (S-PDSO-G8)
click to zoom

INA2290EVM Details

  • Manufacturer Part Number:

    INA2290EVM

  • Manufacturer:

    Texas Instruments

Trust Checks

This model has been provided by community users.
Community Provided
This model has been verified by system checks.
System Verified
This model has been reviewed by community users.
Community Approved
Sponsored

INA2290EVM Overview

Use the download button to access the INA2290EVM schematic symbol, PCB footprint, and 3D model.
To find more CAD model downloads similar to this part, try a partial part number search, like INA22, or try a keyword search, such as Operational Amplifiers

About Texas Instruments

Texas Instruments (TI) designs and manufactures semiconductors and integrated circuits for a wide range of applications. The company's product portfolio includes analog chips, which are essential for managing power and signal functions in electronic devices, and embedded processors, which serve as the brains in various systems, enabling functionality in everything from industrial equipment to consumer electronics. TI's innovations in semiconductor technology have made it a leader in the industry.

Parts related to INA2290EVM

Showing 0 results